top of page
buswork

Tap boxes

Tap Boxes 2000A–4000A
Built to Ship in 2–3 Weeks

generator

01

Tap box TITR ENERGO.jpg

Custom solution for connecting temporary power sources in commercial, industrial, and emergency applications.

4000a

• 2000A / 3000A / 3500A / 4000A custom configurations
• Fast turnaround – typical 2–3 weeks
• Indoor and outdoor enclosures (NEMA 1 / 3R / 4X)
• Installer-friendly layout
• Clear labeling for fast connection
• Built in Florida

Florida

Made in the USA
Built in Florida

Fast delivery when standard gear is too slow
Built for real jobsite installation
Custom fit for your project

02

Our tap boxes are designed for a wide range of temporary and emergency power applications

Emergency & Backup Power:

• Commercial buildings
• Hospitals and healthcare facilities
• Data centers and critical infrastructure

Temporary Power

• Construction sites
• Maintenance shutdowns
• Events and temporary installations

Generator Integration

• Generator docking stations
• Load bank testing
• Utility and infrastructure projects

03

Technical Overview

Voltage:
• 480V
• 600V
Enclosures:
• NEMA 1
• NEMA 3R
• NEMA 4X
Construction:
• Tin-plated copper bus
• Ground bar included
• Installer-friendly layout

Tap box neutral.jpg
nema

Available options:

• Padlockable handles
• Stainless steel enclosures
• Custom labeling
• Project-specific modifications

04

tap box interior
IMG_8975.jpg
Tap box with lugs.jpg
Tapbox

Let's Build the Future Together

Ready to size your tap box?
Send us your project details and we’ll get back to you quickly with a solution.

We typically response the same day

Address

5101 NW 21st Avenue, Suite 140

Ft Lauderdale, FL 33309

Phone

Email

bottom of page