top of page

We respond within 1 business day

Made in the USA
Built in Florida

UL891 Certified
ABB components/
Direct OEM for ABB
Florida-Based Manufacturing
Shop Drawings & Submittal Support
Engineered for Mission Critical Environments
Fast Turnaround
8-12 Weeks
Built for Data Center Demands

High reliability and uptime
Designed for continuous operation and minimal risk
Space-Efficient Custom Layouts
Engineered to fit tight electrical rooms and complex configurations
Seamless Integration
Compatible with UPS systems, ATS, PDU, and monitoring systems
Code Compliance
Built to UL891 standards and data center requirements.
When every week counts, fast lead times make the difference
Major OEM lead times:
30-40+ weeks
TITR ENERGO typical
lead time:
8-12 weeks
bottom of page
