2000A Switchboard.
Fast-track. Built to Perform.
Our 2000A UL891 switchboards are custom-built for commercial, data center, and retrofit applications where reliability, layout flexibility, and lead time matter.
1200A - 4000A Custom Switchboards
UL891 Listed Assemblies
ABB components available
Typical lead time: 8-12 weeks
Built in Ft Lauderdale, Florida
We respond within 1 business day

Made in the USA
Built in Florida

UL891 Certified
ABB components/
Direct OEM for ABB
Florida-Based Manufacturing
Shop Drawings & Submittal Support
Engineered for Mission Critical Environments
Fast Turnaround
8-12 Weeks
Engineered for Commercial, Industrial and Critical Power Applications

High reliability and uptime
Designed for continuous operation and minimal risk
Space-Efficient Custom Layouts
Engineered to fit tight electrical rooms and complex configurations
Seamless Integration
Compatible with UPS systems, ATS, PDU, and monitoring systems
UL 891 Compliance and Documentation
Built to UL891 standards and data center requirements.






When every week counts, fast lead times make the difference
Major OEM lead times:
30-40+ weeks
TITR ENERGO typical
lead time:
8-12 weeks